Projects References

Projects References

PLTMG & Power Plant Industry

DATE : 2017-2018
Power Plant Irian Jaya (Paket VIII)
Year : 2017
Products : 2 sets of Horizontal Fire Pump Cap. 1000 GPM @ 100 Meter

Power Plant Kendari
Year : 2017
Products : 2 sets of Horizontal Fire Pump Cap. 1000 GPM @ 100 Meter
PLTMG Paket IV (Site Bima, Maumere, Sumbawa)
Year : 2017
Products :
2 sets of AURORA Horizontal Fire Pump Cap. 171 m3/h @ 104 Meter
2 sets of SERO Fuel Oil Unloading Pump Cap. 31.35 m3/h @ 24.71 Meter
2 sets of SERO Lube Oil Unloading Pump Cap. 6.6 m3/h @ 13.95 Meter
6 sets of AURORA Sump Pump Cap. 5.5 m3/H @ 21 Meter
2 sets of AURORA Horizontal Fire Pump Cap. 171 m3/h @ 97 Meter
2 sets of SERO Fuel Oil unloading pump Cap. 27.87 m3/h @ 23.07 Meter
2 sets of SERO Lube Oil unloading pump Cap. 6.6 m3/h @ 12.03 Meter
2 sets of AURORA Sump Pump Cap. 5.5 m3/H @ 21 Meter
2 sets of AURORA Horizontal Fire Pump Cap. 171 m3/h @ 97 Meter
2 sets of SERO Fuel Oil unloading pump Cap. 31.35 m3/h @ 24.71 Meter
2 sets of SERO Lube Oil unloading pump Cap. 6.6 m3/h @ 12.03 Meter
2 sets of AURORA Sump Pump Cap. 5.5 m3/H @ 11 Meter
Year : 2018
Products :
6 sets of pilot unloading oil pump cap. 6.6 m3/h @ 57 Meter
PLTMG Paket III (Site Tanjung Selor, Biak, Merauke, Langgur, Seram)
Year : 2017
Products :
10 sets of AURORA Horizontal Fire Pump cap. 750 GPM @ 9 Bar
Year : 2018
Products :
9 sets of AURORA Fuel Pump, Centrifugal Pump, Drain Pit Pump